Projects we have carried out

Have a look at the scale of our projects so far. If you take a look at the pictures of our prime references, you will see the quality of the work that we do.

 

Prime references

Sewage system construction:

Name of investment: Construction of sewage systems in the municipalities of Bátya, Szakmár, Homokmégy, and Öregcsertő

Gross cost: 6 434 952 EUR

Main technical content:

  • 41698 m gravity backbone
  • 20428 m gravity interconnector
  • 27304 m standpipe
  • 20 wastewater pump stations

Name of investment: construction of sewage systems in Fadd, Gerjen, and Dunaszentgyörgy

Gross cost: 5 833 521 EUR

Main technical content:

  • 34 km gravity sewer
  • 16 km sewage standpipe
  • 15 wastewater pump stations

Construction of wastewater treatment plant:

Name of investment: construction of waste water treatment plants in the municipalities of Gyergyóremete, Gyergyóditró, and Gyergyószárhegy

Gross cost: 2 185 861 EUR

Main technical content:

  • 2500 m3 /day with activated sludge, total oxidation, denitrifying treatment with phosphorus removal and sludge dewatering
  • Unified volume of constructive work 3500 m3
  • Useful volume of postsedimentator 2500 m3
  • 2 mechanical bars
  • postsedimentator: 2300 m3, disinfector: 100 m3 , sludge-thickener: 150 m3

Construction of drinking water network:

Name of investment: construction of the drinking water networks in Etéd and Küsmöd

Gross cost: 813 773 EUR

Main technical content:

  • 23937 m drinking water standpipe
  • 20 public wells and 20 fire hydrants

Construction of waterworks:

Name of investment: construction of drinking water network and waterworks in Székelyderzs

Gross cost: 190 592 EUR

Main technical content:

  • 6041 m drinking water standpipe
  • 200 m3 surface reservoir

Construction of storm sewers:

Name of investment: Construction of storm sewer network for the North Western area of the municipality of Báta

Gross cost: 380 049 EUR

Main technical content:

  • 2175 m ditch paved with 2175 m water course elements
  • 472 m culvert
  • 119 gate driveways

Internal water regulation:

Name of investment: water course regulation of the Hagymás stream in the municipality of Báta

Gross cost: 227 096 EUR

Main technical content:

  • construction of a 1726 m drainage ditch
  • 375 m paved ditch
  • 61 m rubble paved ditch

Large mass earthwork:

Name of investment:Expanding the Cemetery of Alsóváros in Szekszárd

Gross cost: 252 945 EUR

Main technical content:

  • transportation of 4500 m3 earth, construction, landscaping, and construction of a fence

Sidewalk and road construction:

Name of investment: sidewalk reconstruction in the city of Szekszárd

Gross cost: 493 332 EUR

Main technical content:

  • Construction of sidewalk pavement and correction with concrete driveways

Basement filling:

Name of investment: Szekszárd, Kiss J. u. -- basement filling

Gross cost: 1943 EUR

Main technical content:

  • basement masonry work with basement masonry components 13,1 m3
  • filling with gravity technology 19,6 m3
  • road construction work 6 m2

River wall and retaining wall construction:

Name of investment: Retaining wall construction in the municipality of Szálka

Gross cost: 76 730 EUR

Main technical content:

  • Retaining wall of monolithic concrete 115,3 m3
  • 101 m long, average height of 2,5 m
  • 10 tons of reinforcing steel used

Structure construction:

Name of investment: manure and slurry storage for the pig farm at Kapoly, land register reference number 065/2

Gross cost: 172 746 EUR

 

References (include, but are not limited to)

  • Csíkszentimre-- construction of drinking water network
  • Kölesd and Kistormás municipalities-- construction of sewage and wastewater treatment system
  • Szálka, Kossuth L. utca—precipitation regulation
  • Szekszárd, Parászta stream --regulation