Sewage system construction:
Name of investment: Construction of sewage systems in the municipalities of Bátya, Szakmár, Homokmégy, and Öregcsertő
Gross cost: 6 434 952 EUR
Main technical content:
- 41698 m gravity backbone
- 20428 m gravity interconnector
- 27304 m standpipe
- 20 wastewater pump stations
Name of investment: construction of sewage systems in Fadd, Gerjen, and Dunaszentgyörgy
Gross cost: 5 833 521 EUR
Main technical content:
- 34 km gravity sewer
- 16 km sewage standpipe
- 15 wastewater pump stations
Construction of wastewater treatment plant:
Name of investment: construction of waste water treatment plants in the municipalities of Gyergyóremete, Gyergyóditró, and Gyergyószárhegy
Gross cost: 2 185 861 EUR
Main technical content:
- 2500 m3 /day with activated sludge, total oxidation, denitrifying treatment with phosphorus removal and sludge dewatering
- Unified volume of constructive work 3500 m3
- Useful volume of postsedimentator 2500 m3
- 2 mechanical bars
- postsedimentator: 2300 m3, disinfector: 100 m3 , sludge-thickener: 150 m3
Construction of drinking water network:
Name of investment: construction of the drinking water networks in Etéd and Küsmöd
Gross cost: 813 773 EUR
Main technical content:
- 23937 m drinking water standpipe
- 20 public wells and 20 fire hydrants
Construction of waterworks:
Name of investment: construction of drinking water network and waterworks in Székelyderzs
Gross cost: 190 592 EUR
Main technical content:
- 6041 m drinking water standpipe
- 200 m3 surface reservoir
Construction of storm sewers:
Name of investment: Construction of storm sewer network for the North Western area of the municipality of Báta
Gross cost: 380 049 EUR
Main technical content:
- 2175 m ditch paved with 2175 m water course elements
- 472 m culvert
- 119 gate driveways
Internal water regulation:
Name of investment: water course regulation of the Hagymás stream in the municipality of Báta
Gross cost: 227 096 EUR
Main technical content:
- construction of a 1726 m drainage ditch
- 375 m paved ditch
- 61 m rubble paved ditch
Large mass earthwork:
Name of investment:Expanding the Cemetery of Alsóváros in Szekszárd
Gross cost: 252 945 EUR
Main technical content:
- transportation of 4500 m3 earth, construction, landscaping, and construction of a fence
Sidewalk and road construction:
Name of investment: sidewalk reconstruction in the city of Szekszárd
Gross cost: 493 332 EUR
Main technical content:
- Construction of sidewalk pavement and correction with concrete driveways
Basement filling:
Name of investment: Szekszárd, Kiss J. u. -- basement filling
Gross cost: 1943 EUR
Main technical content:
- basement masonry work with basement masonry components 13,1 m3
- filling with gravity technology 19,6 m3
- road construction work 6 m2
River wall and retaining wall construction:
Name of investment: Retaining wall construction in the municipality of Szálka
Gross cost: 76 730 EUR
Main technical content:
- Retaining wall of monolithic concrete 115,3 m3
- 101 m long, average height of 2,5 m
- 10 tons of reinforcing steel used
Structure construction:
Name of investment: manure and slurry storage for the pig farm at Kapoly, land register reference number 065/2
Gross cost: 172 746 EUR
References (include, but are not limited to)
- Csíkszentimre-- construction of drinking water network
- Kölesd and Kistormás municipalities-- construction of sewage and wastewater treatment system
- Szálka, Kossuth L. utca—precipitation regulation
- Szekszárd, Parászta stream --regulation